Holy Molly is Standen doing. Are you done testing the well. Holy Krap, it's been well over 2 months since spud of the well. I work in the oilfield and wells of similar depths were drilled cased and put into production in less than three weeks. I suppose that doing the work through christmas slowed things down some and it is a esploratory well and not a development well but they should have had enough info from the 3D and the wireline logging to indicate if testing the well is warranted. Testing the well does not take that flippin long neither. I don't know but time is money and they seem to be wasting a lot of time. JMHO. Get after it!!!