RE: Assumptions discussion The only caveat here is where is our tonnage going to end up? Can we get the 10M tonnes minimum to make this a mine? How about the 20M tonnes to make this a potential $55 stock? Here is some thoughts on the potential tonnage:
Like I said is the one question mark that I have and that more drilling will confirm. However, I wanted to see how hard it would be to get a reasonable tonnage from this single pipe. The densities of graphite, quartz and feldspar are similar at around 2.6t/cubic meter. We have established a 450m step out in an East West direction between both groups of drill holes. We have traced mineralization from 44m to as deep as 522m and have about 350m from a North South direction (hole 1 79M from collar and hole 9 370m from collar).
Now, of course the mineralization is not consistent throught out that hole volume but let's just for fun use 450m wide by 200 long by 200 wide at the 2.6t/m3, that gives us at total tonnage of46.8M tonnes
Now that makes me feel a whole lot better about us getting to critical mass. This one pipe alone could get us the 50M tonnes I had in my wet dream scenario!!
Sweet dreams again!
G.