RE: debt to equity To date, development mining on the veins has produced and placed on surface approximately 1,100 tonnes of material with an average grade of 12.83 gpt from the Edwards #1 vein and 2,000 tonnes grading 2.0 gpt from other underground development.
Read more at https://www.stockhouse.com/bullboards/messagedetail.aspx?s=STK&t=LIST&m=32286516&l=0&pd=2&r=0#u3WkIwA3BwIjemfr.99
1,100 tonnes of material with an average of 12.83 gpt times $ 1577.00 = $1,734,700.00.
WHY ARE THE BOD SITTING ON THERE HANDS AND NOT SEELLING THE STOCK PILE??????????
tinyhopes
1,100 tonnes of material with an average of 12.83 gpt times $ 1577.00 = $1,734,700.00.
WHY ARE THE BOD SITTING ON THERE HANDS AND NOT SEELLING THE STOCK PILE??????????
tinyhopes