TSXV:PEM.P - Post by User
Post by
prospector7on Apr 05, 2013 12:29pm
231 Views
Post# 21216219
its 0.4 call me stupid who cares Im old
its 0.4 call me stupid who cares Im old The current Blackwater Mineral Resource estimate includes 1,002 holes totaling 309,509 metres. As previously disclosed, New Gold is segregating the portion of mineralized material that should be processed directly versus that which the company plans to stockpile and process toward the end of the project's mine life. The company has utilized a dual cut-off strategy to outline this segregation. Consistent with the previous Blackwater Mineral Resource estimate, all material with a gold-equivalent cut-off of greater than 0.4 grams per tonne is considered for direct processing, while all material with a gold-equivalent cut-off between 0.3 and 0.4 grams per tonne is planned to be stockpiled.