RE: Plans and Sections ok,
I have done a little more work, it looks like it is a 5-15m thick mineralisation lens which is between 20-50m deep, length at the moment somewhere less than 100m? though the whole conductor is probabley weakly mineralised along it's entire length.
The vertical drilling is a problem in my mind, they are drilling a subvertical structure so if they drill in to a fracture or vein they will seriously over estimate the grade, none-the-less it looks good and they are releaseing some great interecepts. hole 66 will be interesting.
any other thoughts on this will be appreciated
TS