Q3 mine mill feed from the 4 mines The total volume of production at the mine during Q3 was 17,961 tonnes, grading 1.23 g/t Au and 249.43 g/t Ag. 45% of volume was produced from Tajos Cuates, 16% from Santa Fé Project, 9% from Florida and the remaining 30% from the San Francisco Project.