RE: RE: RE: RE: RE: RE: RE: Mickey Fulp Should... He also said your arguments were ad hominem...your use of gloryhole proves that he has pegged you very well.
I find it funny how you did not refute any of the information I posted about you. I guess you are the kept man I was told you were.
Since this is on the ZEN board and I hate to wastes everyone's time with a little man like you, here are my latest thoughts on ZEN:
Someone from the town that I know well knows one of the suppliers of the site and he has been told on numerous occasion that this would be huge. Take that FWIW. I do believe tonnage will come in around 80-100M tons probably somewhere between 4-5% grade. This is however based on decent data on East pipe and then transposing that data on the geophysics so some risk there for sure. However, we should have a minimum of 40M tons at 4-5% in the East pipe and at a production rate of 100k of finished product per year, that is enough for a 20 year LOM. For this reason, I think the biggest risk is removed here and from the drillers perspective, I can see why they say this will be huge. The other side of the equation which the drillers cannot possibly know is what our product will fetch in terms of revenue per ton. However, even if we only sell this stuff for $2000 per ton with production cost of $500 per ton, we would still generate $150M profit per year. Our current market cap is below this still so entry at this level should be safe and should generate a multibagger even with these very conservative estimates. If we can be a fit for the nuclear industry or lithium ion batteries or Arc Furnace electrodes, we should command much more than $2000 per ton so the upside is very exciting. Like all resource plays though, we need patience while they drill out the resources and figure out best use for our product.
G.