Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Rochester Resources Ltd V.RCT

Alternate Symbol(s):  RCTFF

Rochester Resources Ltd. is a Canada-based company engaged in the exploration and development of its mineral property interests in Mexico. The Company holds a 100% interest in the Mina Real and San Francisco Properties, which are located in the state of Nayarit, Mexico, east of the state capital city of Tepic. In addition, the Company has an agreement to acquire a 70% interest in the Santa Fe Property. The Mina Real Property consists of 11 mining concessions and one mineral claim encompassing a total area of over 21,367.42 hectares (ha). The contiguous Santa Fe Property consists of one mining concession totaling approximately 3,852.66 ha. The San Francisco Property consists of 12 mining concessions encompassing over 18,125.05 ha. Its subsidiaries include ALB Holdings Ltd., Mina Real Mexico S.A. de C.V. and Compania Minera Santa Fe S.A. de C.V.


TSXV:RCT - Post by User

Bullboard Posts
Post by denj681on Apr 30, 2013 12:32am
88 Views
Post# 21558179

Road and power grid building at San Francisco

Road and power grid building at San Francisco

The construction of a dirt road of approximately 2km has started to connect the San Francisco Project with the Ejidal Community of "Los Fortines"; and 10km of roads will be rehabilitated to reduce by 30% the haulage distance to the plant.

The procedure to bring power to the project from the grid (CFE) has commenced.

At Lluvia de Oro area, exploration works show good results. With the development of ramp 1585, FT 1570 and the CP´s 1572 SE and NW, blocks LLO-05, LLO-09, LLO-10 and LLO-11 have been extended to the NW end and at depth.

At Agua Negra area, activities resume through the cross-section near the drillholes cuts NG-07-001 and NG-07-002 with average grades of 7.81 g/t Au and 815 g/t Ag over a width of 2.28m and 7.35 g/t Au and 433 g/t Ag over a width of 1.03 m respectively. There are about 50m more to reach the area.

At Cholita area, level 1615 is being developed with good results.

At the Lluvia de Oro area work continued at the 1600 Level working face with its advance towards the south east end. The objective of this development work is to develop this level as the main access to surface for this system. In addition a C/P is being developed as infrastructure to improve ventilation in the mine. Construction of loader No 3, in level 1570, was completed.

In March 2013, construction started on a road from the yard of the San Eduardo Tunnel, elevation 1520, with a bulldozer with the objective to increase in the short term the mineralized material in blocks LLO-10, LLO-11 LLO-15 and LLO-16. This will also serve as ventilation and drainage infrastructure for the upper levels, as well as the main access point from where all parallel works of the Lluvia de Oro - Cholita system will integrate in the medium term.

At the 1620 Level, Cholita area, construction of loader No 2 was completed over general services ramp in level 1590.

 

Bullboard Posts