OTCPK:MAUXF - Post by User
Post by
WAYFRTon Aug 08, 2013 1:45pm
502 Views
Post# 21657143
Wating for CONDUCTOR pipe
Wating for CONDUCTOR pipe
FOR ONCE AND FOR ALL::::::::
Mart has made 2 attempts already on the 3rd slot on the 9.10.11 pad BOTH FAILED , Now we are waiting for some more Conductor pipe so the RIG 201 has been pulled forward aprox 6 feet in the same slot UMU 11 will be drilled from after the Conductor pipe has been driven in the ground aprox 400 feet. Lets move on to something else BOYS.
WAYFRT
PS . anyone heard anything of the rental Rig that will be doing the Horizontal s on.