GREY:BYVVF - Post by User
Post by
FrankSmarton Aug 30, 2013 7:46pm
327 Views
Post# 21710920
Latest Drilling Update - Sept 30th
Latest Drilling Update - Sept 30thBayfield Rainy River Drilling / Exploration Update, NW Ontario:
Rainy River Burns Block drill hole RR10-13 has been completed to 719 metres. The hole passed into the foot wall transition zone at 708 metres. Last reflex at 707 metres shows 10.2 degree azimuth and 83.7 degree dip.
Robert Marvin, P.Geo., CPG, VP Exploration for Bayfield Ventures is the Qualified Person as defined by National Instrument 43-101 and supervised both the project field work and the preparation of the technical information in this update.