RE:RE:RE:RE:RE:RE:RE:geeraf1WHAT PART OF THE DRILLING IS NOT UNDERSTOOD?..............................................................................Can
ada Carbon conducted drilling over late July and early August (Table 1), with the objective of testing the depth and lateral extent of the various veins. The results show that the graphitic vein system extends to a depth of at least 39 m beneath the VN2 surface occurrences. ((THE SYESTEM EXTENDS TO = ALMOST 90 METERS DEEP "ALL VEIN GAPHITE")) Drillhole DDH13-04 intersected visual graphite over 1m at a depth of 22 m under VN2 ((SO WE 3 FT SHOWING DOWN TO AROUND 70 FT)) while drillhole DDH13-03 intersected graphite mineralization 39 m beneath VN2, with visual graphite associated with wollastonite over 1 m, within a 4 m interval of graphite((12 MORE FT)) and wollastonite. Small graphite veins occur throughout all of the drill cores. THE SMALL GRAPHITE VEINS ARE FILLERS. THIS IS OPEN PIT AND VERY SHALLOW. ALSO VERY INEXPENSIVE. YOU CAN SEE IT. THE SMALL VEIN OCCURANCES FILL THE GAPS...LOTS OF GRAPHITE!! Drilling indicates that the mineralization is easily followed between surface and depth. A second graphitic unit was intersected in DDH13-04, at an estimated depth of 33 m, with 1.3 m of graphite in pegmatite and wollastonite. (MORE GRAPHITE) The same hole intersected a 10 centimetre (“cm”) graphite vein at 40 m depth. (THEN THEY HIT MORE AT DEPTH BELOW THE THIRTY SOME METERS. COULD GO DOWN DEEPER YET, IN OTHER WORDS IT MAY BE OPEN AT DEPTH. RIGHT NOW THEY ARE DRILLING AT 60 FT WHICH IS SHALLOW EVEN FOR OPEN PIT!!) Other exploration holes intersected small graphite veins or disseminations while testing the SSW extension of VN1 and VN2 but subsequent trenching reveals a NE alignment of individual graphite pods, following the marble-paragneiss contact. Core logging and sampling was done and the first batch of samples was sent to Actlab (Ancaster, ON), with results expected in the following two weeks
LOTS OF GRAPHITE AND THEY ARE JUST GETTING STARTED. WAIT FOR A WHILE TILL THEY DRILL DEEPER. WE MAY NOT EVEN REQUIRE A 43-101. ITS ALL RIGHT THERE!!