Mine operations (mill feed)The total volume of production at the mine during Q4 was 17,773 tonnes, grading 1.43 g/t gold and 258.07 g/t silver. 43% of volume was produced from Tajos Cuates, 5% from Santa Fé Project, 26% from Florida and the remaining 26% from the San Francisco Project.