Fion SidetrackDrilling of the Fion sidetrack sceduled to start next week.
Please note that the following Drilling Operations for Fionn 211/22a-6
Drilling Rig /Ship Start / Finish Installation Name/ Well No Position
Transocean GSF Arctic III 29/10/13 For 57 Days Fionn 211/22a-6 61°14.437'N 01°22.061'E