Mine operations mine feed volume percentages The total volume of production at the mine during Q1 was 18,128 tonnes, grading 2.3 g/t gold and 265.18 g/t silver. 31% of volume was produced from Tajos Cuates, 8% from Macedo, 23% from Florida and the remaining 38% from the San Francisco Project.