GREY:GLBCF - Post by User
Post by
GeneralKesefon Oct 31, 2013 3:30pm
168 Views
Post# 21866336
IT DOED NOT TAKE LONG TO DRILL
IT DOED NOT TAKE LONG TO DRILLAND IT DOES NOT TAKE A LONG TIME FOR RESULTS!
and you never know when the next results hits!
but if you have no inventory you cannot win!
do your own research
general kesef
To date, Global Cobalt has engaged one of two drill rigs on site and have completed two drill holes. The first hole, Hole #174, was drilled to a planned depth of 120m, twinning the existing Soviet era hole C-3. The hole was shut down as planned at 120m andvisual inspection of the core indicated that the mineralized zone was intersected as expected. The historical intercept was 38.5m - 50.6m, totaling 12.1m in length of 0.041% Co, 0.14% Bi, 0.545% Cu and 0.084% WO3. The second hole, Hole #175, is complete to 160m and was drilled to test the same historic zone as Soviet era Hole C-3 in Mineralized Zone 5. Historical intercept for Hole C-2 was 88.9m - 133.8m for a 44.9m intercept of 0.194% Co, 0.123% Bi, 1.294% Cu and 0.209% WO3. The twinning intersected a thick section of mineralization at an interval approximate to that of historic core. Visual inspection suggests the zone has been confirmed and both holes are being logged and marked for sampling. The Company has started its third hole, Hole #176, which will twin Soviet era hole KK-12. Drilling by the second rig is anticipated to commence within the next week
happy halloween