RE:RE:BG PumpingI find it difficult to believe that RMC weren't aware Freeport was drilling on 100% ground. And 8 drill holes which took considerable time to drill. Also RMC staked that ground based on early drill results of Freeports drlling without them knowing. It all seems a little strange to me. A case could be made by Freeport that the 100% RMC ground falls within the area of interest of the original deal and it should be treated as such. Things should heat up early in the new year with more drill results from 2013. And the BG stuff should stay on the BG board. And anyone looking for the next RMC might want to buy more RMC. This baby has a long ways to go yet. I think RMC will hit double digits in 2014.