RE:RE:RE:Assays?I could be wrong but the following two statements both refer to the entire 39,079.50m drilled at Cukaru Peki being included which I believe includes all hole up to 1349. "The Mineral Resource model prepared by SRK utilises some 39,079.50 m of drilling at the Cukaru Peki site. The Mineral Resource estimate was completed by Mr Martin Pittuck, MIMMM an appropriate “independent qualified person” as this term is defined in National Instrument 43-101. The effective date of the resource statement is 27th November, 2013. The Mineral Resource model includes only the HSE mineralisation at Cukaru Peki (the underlying Porphyry has not been not modelled due to low confidence in geometry and boundaries).
and then we have this... "During the 2011-2013 exploration programme, a total of 45 holes totalling some 46,264.10m have been completed by Rakita in the Brestovac-Metovnica exploration permit, designated the FMT-series holes in the database provided. The 2011-2013 programme included 35 holes for 39,079.50 m at Cukaru Peki and 10 holes for 7,184.6 m outside the current target area."