Deep Tuzo Drilling and ScheduleThe deep Tuzo drilling will start in 2/14 and be completed by 5/14! The drilling crew is already on site. The drilling program will include 3 holes that will each be drilled to a depth of at least 750 meters, for a total drilling program of 2250 meters. The 3 holes will "bracket" the deep Tuzo pipe and extend our knowledge of the Tuzo pipe to at least 750 meters. In the 10/21/10 Feasibility Study, Tuzo only had a grade of 1.13 carats per tonne. My recollection is that from 360 meters to 564 meters, Tuzo has a grade of 1.6 carats per tonne. The 8/2/13 Resource Statement reported a total indicated and inferred diamond resource of 75.1 million carats for Gahcho Kue, with most of the increase attributable to Tuzo! If the "Big Barrel" of Tuzo continues down to a depth of 750 meters at a grade of around 1.6 carats per tone, there is no question that the diamond resource at Gahcho Kue will increase significantly!