Updated presentation.I just came back from Mexico and I apologize if the updated presentation on Ithaca’s website was already mentioned.
Looking at the data provided in that presentation, the A2 horizontal section is 624’ longer than the A1 horizontal section (So much for the apparent length on the diagram and explains why A2 took longer to drill). In addition, the A2 horizontal section has almost twice the net pay length ( A2 2,514’ / A1 1,312’). IMO the A2 well had better results than A1 given the higher amount of oil and the fact that the choke used on the A2 well was 18% smaller than the A1 choke.
| A1 well | A2 well |
Oil bbl/d | 6,499 | 7,281 |
Gas MMscf/d | 26 | 19 |
Total boe/d | 10,835 | 10,442 |
Choke Size | 56/64-inch | 44/64-inch |
Horizontal Section ft | 2,499 | 3,123 |
Net Pay ft | 1,312 (53%) | 2,514(81%) |