RE:RE:Any Resolution in sight?Where did you see that?
last I heard the plan was to do 3d seismic over the entire Loto/kamal area to determine where to sidetrack.
Loto to needs better isolation of the water zone, which theoretically could be remediate, but kamal needs a sidetrack as they suspected the lower net pay could be due to the well being too close the the oil-water contact.
Kamal has has a huge aerial closure, and could be like Pxt's Akira discovery.