Goldcorp drillingIn the drill table total, 28 drill holes were completed at the Xochipala prospect during a two-year option agreement held with the prospect owners. Sixteen of these holes (3,541.2 m) were drilled in 2011, and an additional 12 holes (3,318.75 m) in 2012. Goldcorp has, since 31 December 2012, decided not to proceed with the option.