Fission Hits 16.18m Total Composite "Off-Scale" in 85.5m This good news is potentially a lift for all. Interesting that hits reported apparently in area of low Radon survey readings, following 3B conductor. SYH strategy of following other conductors, same survey tech. in Preston lake drill. Highly unlikely that PLS & NE on conductor 3B the only zones of U308 mineralization in W Athabaska. Have done my DD on SYH, like company/location/ prospects. Have a lot of FCU and also SYH. Pulling for both. DYODD. GLTA.