Waiting againThought I would do some dreaming. Was looking back at the 43-101 report on the Valdirao. 35,000 tons over 4.4 hectares, approx 8000 tons/hectare. When the deal is done (not if, positive thinking) we should be cresting 140,000 Hectares (including Jaburi) in total Manganese bearing land mass. Being conservative, say only half of that land mass is worth mining, 70,000 hectares.
70,000 hectares x 8,000 tons/hect = 560,000,000 tons
560,000,000 tons x $ 200/ton = $ 112,000,000,000
Even thinking on the low side of things, it doesn't take long to add up.