Crews will be on the ground on June 7thFor the upcoming drill season North American Nickel is planning a two drill program at its Maniitsoq project. The
first drill is set to test immediate down plunge extensions of nickel sulphide mineralization as defined by the 2012/2013 drill campaigns and the associated Crone three-component borehole electromagnetic (BHEM) geophysical surveys at the Imiak Hill Conduit Complex (IHCC) focusing on:
· Imiak Hill, drilling down plunge of drill hole MQ-13-028, which intersected
24.75 metres of near massive to massive sulphide grading 3.19% Ni, 1.14% Cu, 0.11% Co, including;
o
17.91m of 3.80% nickel, 1.42% copper, 0.13% cobalt and 0.01 g/t PGM
· Imiak North, drilling down plunge of drill hole MQ-13-029, which intersected
55.75m of disseminated to near massive and massive sulphide grading: 1.28% nickel, 0.36% copper, 0.04% cobalt, and 0.03 g/t PGM, including;
o
9.99m of 4.65% nickel, 0.33% copper, 0.13% cobalt and 0.08 g/t PGM
· Spotty Hill, drilling down plunge of drill hole MQ-12-005, which intersected
123.94 meters of disseminated, net-texture, to near massive and massive sulphide grading: 0.81% nickel, 0.21% copper, 0.03% cobalt & 0.26 g/t platinum (Pt) + palladium (Pd) + gold (Au), including:
o
24.20 m @ 1.75% Ni, 0.34% Cu, 0.06% Co & 0.52 g/t Pt+Pd+Au.
News Link