NEB stats & road closureCOP was flow-testing and flaring right down to the wire - rig lease date April 7th. I noticed that the Tulita winter road was closed a week later.
|
Closed for the Season |
|
2014 Apr 15
09:24:00 |
|
|
CLOSED FOR THE SEASON.
|
MAINLAND NWT
COPRC Mirror Lake P-20 Beaver Drilling 2 283.3 m 24/01/2014 3152.0 m 64°59’58.0” Rig Released 7 April 2014
300P206500126450 289.3 m 126°47’8.7”