RE:RE:RE:TuzoShakers, Mountain Province has said previously that the Tuzo results would be out by May 31. The May 15 information, then, may present the results of the 3 hole drilling program, without the analytical results. However, if the 3 holes hit kimberlite at 750 meters, it is likely that the grade will be similar to the grade at 564 meters, namely about 1.6 carats per tonne. It is all coming together!