GREY:STPJF - Post by User
Post by
Duxingon Jun 10, 2014 2:50pm
398 Views
Post# 22646598
2P5 production improvement is garranteed
2P5 production improvement is garranteed here is why.
Current flowing temperatures are very tightly conformed. Actual near wellbore temperatures are being masked by production of hot fluids from the toe of the well.
It was the hot well bore stopping the production from ramping up. once ICDs are installed the hot fluid from teh well toe will be restricted or even stopped.
As you can understand from this case, a well conformed well may not be a good thing because the well was too hot --- entire well bore temperature was around 210 to 220 degree. what is this? Quite possible it is Steam. we need subcool to produce oil. you can check the temperature in other well with good production rate, then you may understand what this means.