TSXV:CVI.P - Post by User
Post by
Brimleyon Sep 11, 2014 9:55am
204 Views
Post# 22926408
Sep 9: pipeline to the Ras Isa terminal was fixed.
Sep 9: pipeline to the Ras Isa terminal was fixed.CALGARY, Sept. 9, 2014 /CNW/ - The Company has been informed that the main export pipeline to the Ras Isa terminal has been repaired and the Company has resumed transporting crude oil to the pipeline facility.
https://www.newswire.ca/en/story/1408602/calvalley-petroleum-inc-tsx-cvi-a-operations-update