GREY:NEPTF - Post by User
Post by
goldstoryon Sep 15, 2014 10:01am
436 Views
Post# 22936077
Production ramp up schedule
Production ramp up schedule
It was Aug 14th that Neptune announced the 50 metric tons/yr production was reached. Since they said that it was the 90 day schedule to ramp up to 150 metric tons/yr, it should be very close to ramp up to 100 metric tons/yr production by now. I hope that Neptune announces that soon.