News Mr. Ed Kruchkowski reports
BOW DRILLING UPDATE
Decade Resources Ltd. has completed 15 drill holes testing different zones on the Bow property. The results from the first two holes testing the area of the Blueberry and Big M vein areas have been released. Holes 3 and 4 tested this same area and while awaiting assay results from these holes, the company tested other mineralized areas. Drilling of two long holes, one 365 m and the second 310 m long, in an area of a historic gold-copper-molybdenum anomaly in soils, intersected sulphide mineralization over the entire interval in the first hole and over most of the second hole. Pyrite mineralization forming up to 30 per cent of the core was intersected over 30 m in the first hole.
Results from the first two holes are summarized in the associated table.
DRILL RESULTS Drill hole From To Width Au No. (m) (m) (m) (g/t) DDH-14-Bow-1 44.60 94.21 49.6 15.25 including 58.91 72.10 13.20 56.70 DDH-14-Bow-2 31.55 44.21 12.66 39.43 including 37.96 44.21 6.25 69.65
Mineralization in DDH-14-3 was similar to mineralization in DDH-14-2 while DDH-14-4 intersected similar mineralization to DDH-14-1 over a 40 m interval.
Assay results for DDH-14-3 are expected shortly. Other drill holes are being logged and core is being cut with samples to be shipped for assay.