RE:RE:RE:RE:RE:RE:RE:RE:CGG/Qiangtang Basin contains upwards of 70 billionbarrel oIL lots of power at CGG Jiama mine
Labour:Regarded as sufficient to operate and maintain all unit processes in the specified plant.Manning costs are in- line with current pay rates in China. All unit processes in the plant described above are catered for and provides for shift crews to run the plant on a roster which
will allow a 24 hour 7 day week operation. Adequate technical support and assay services are provided for.Power:
Usage estimated is commesurate with requirements for installed power to drive
specified process equipment and based on grid power supplied via a new line into the region. Substantial infrastructure has been developed for the Phase I of the Project and includes access roads, power supply and water supply for mining and mineral processing as well as a tailings dam. The Company is in the process of upgrading these facilities to ensure that the
forecast production expansion to 16.5 Mtpa ROM ore can be achieved during Phase II. As
these upgrades are mostly further expansion of already
built infrastructure,it is unlikely that any material risks will be experienced Mining Facilities The design of the mining facilities has been driven by the need to minimize costs, yet provide substantial support systems for the life of mine. The major buildings have design lives of 50 years