Cote Lake vs Detour Gold
Is there any comparison between Detour Gold and the Cote Lake deposit and is there any possibility to model a mining operation from what they have built and learned at Detour towards the plannning of Cote? Both are low grade bulk tonnage deposits. I understand that DGC is twice the size however with 7M ounces of gold in an open system there could easily be 400k ounces per year wtih a 16-20 year mine life. If Iamgold could steal the brains behind the successful ramp up and ops at Detour at least they could start the paper work and studies needed to move the project forward.