Quinde-3 - From the last NR:
- "Delayed completion of the Quinde-3 well pending reperforation and potential stimulation now anticipated in January of 2015"
I wonder if this has been completeed and successful?
This from the Dec. 15th NR in reference th Quinde-3:
"The Quinde-3 well was directionally drilled by operator Vetra, to a total depth of 10,430 feet from the Quinde multi-well surface pad and encountered 20 feet of net pay (true vertical depth) in the N Sand formation. The well, drilled 1.4 kilometres west of the Quinde-7 well, validates the Company's geological mapping of the extent of this recently discovered pool. After cementing production casing in place the Quinde-3 well is expected to be perforated over the N sand pay interval and equipped to pump, and is expected to commence permanent production into the existing Quinde production facility prior to the end of December 2014. "