RE:Since all the news got buried, recap 11th of March: According to Pruett the adit will intersect high grade material within the next week.
today 18th of March, are they in the visible gold zone? How long before next NR for proof.
CMC and PBI focus first on mining selected high-grade sections, which
material is subsequently just crushed and grinded in order
to be shipped directly to a processing facility.
the first zone to be encountered with adit #5510 showed as much as
124 g/t and 218 g/t gold in 2 drill holes. Hence, all of the extremely
high-grade material will be transported on trucks to
CMC’s Bishop Mill, where it will get crushed and grinded.
CMC does not need to concentrate the material
by putting it through the flotation circuit; hence CMC
is not creating waste for the tailings pond. The milled
rocks can be shipped directly to a processor facility
in order to produce saleable gold doré bars. Metallurgy
showed favorable recoveries in excess of 90%.