GREY:PGDIF - Post by User
Post by
ekimon Apr 07, 2015 10:38am
82 Views
Post# 23603828
Stornoway news release today.
Stornoway news release today."The Renard diamond plant's face-plate capacity of 2.2mtonnes per annum is based on a 78% overall plant utilization, and the flow sheet design incorporates a Large Diamond Recovery capacity of up to 45mm (equivalent to a 600 carat round octahedral stone). "
They sure are trying to milk the potential of a large stone popping out of the run of mine feed.
Maybe Peregrine should include a line like this in every release:
"Given the number of large stones in this parcel, and their relatively high value, even the high modelled price may be considered conservative. (Lack of a 600 carat round octahedral stone in this theoretical model makes this a conservative estimate)"
:)
LONG...PGD
EKIM