RE:News update
Reading between lines and comparing to my info, I asking; how can you plan and instruct for production proceses before constructing the mill.
I read,
3. Internal Technical Review
In January 2015, the Company directed its Technical Advisory Committee to coordinate an internal technical review to confirm key assumptions as follows:
• Mine Capacity - With NCL, re-assess the sustainable production rate for the Angostura vein systems to provide an attractive balance between tonnes produced and optimum head grade for an underground operation.
• Relocate Project Infrastructure - With the objective of reducing potential impacts on or risks to the environment and local communities, Eco Oro has identified alternative plant locations and preliminary materials handling options for the selected production rate and a reduced footprint wherever possible.
• Processing enhancements - Extensive internal process trade-offs have allowed Eco Oro to identify options for enhanced overall recoveries and to reduce the capital and operating cost. The current focus of process trade-offs is as follows:
- Crush, grind, flotation and sale of concentrate
- Crush, grind, flotation and ultra fine grinding (UFG) of concentrate and leaching of concentrate
- Ultra fine grinding of concentrate combined with leaching of floatation tails
- Biox Option
- Pressure Oxidation Option
“Project Infrastructure - Eco Oro and its consultants have re-evaluated concepts for preferred access routes, siting of a potential process facility and tailings options through the lens of environmental impact, community considerations, technical risk and financial outcomes. “
I believe all is in place for news sooner than even end of may, and it will be big huge
The Key is AUX.
GLTA,
Dan