RE:PLS 3D Resource VideoFabulous video, can't wait for an update which includes the 2015 winter drilling
But I doubt they ever build the open pit out to the northeast extremity, mine, open pit more logically changed to underground about 1/2 ways along, so then much smaller footprint and much lower strip ratio, so less costs.
THe basement rock is high integrity rock so wall and roof support for underground mine be fine
jawcellis wrote: video uploaded 4 days ago.
https://vimeo.com/125720842