Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

First Graphene Ord Shs V.FGR.H


Primary Symbol: FGPHF

First Graphene Limited is an Australia-based company focused on the development of advanced materials to help industry improve. The Company is a supplier of graphitic materials and product formulations with a specific commercial focus on global markets, including cement and concrete; composites and plastics; coatings, adhesives, sealants and elastomers (CASE), and energy storage applications. The Company offers a range of graphene nanoplatelet products under the PureGRAPH brand name. Its PureGRAPH graphene products include MB-LDPE graphene enhanced masterbatch, MB-EVA graphene enhanced masterbatch, MB-EVA Bitumen graphene enhanced masterbatch, AQUA pre-dispersed graphene additives and Nanoplatelet additives. Its PureGRAPH range of graphene products includes PureGRAPH 20, PureGRAPH 10 and PureGRAPH 5. The Company's graphene products can be used for various applications, such as plastics, composites, rubbers and elastomers, cement and concrete, and inks and coatings.


OTCQB:FGPHF - Post by User

Post by rwhittson May 05, 2015 9:04am
119 Views
Post# 23694175

And more good news :)))

And more good news :)))

May 05, 2015 08:48 ET

DuSolo Drill Results Confirm Additional High Grade Phosphate Mineralization at the Bomfim Project

VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 5, 2015) -DuSolo Fertilizers Inc. (TSX VENTURE:DSF)(OTC PINK:ELGSF)(FRANKFURT:E6R) ("DuSolo" or "the Company") is pleased to announce the drill results from the first round of its 2015 drilling campaign (the "Campaign") at the Bomfim Agro-mineral Project ("Bomfim Project"). Drill result highlights include:

  • Hole STW-RC-91: 27.00 metres at 12.31% P2O5 including 6 metres at 22.85%
  • Hole STW-RC-100: 21.50 meters at 11.31% P2O5 including 4 metres at 18.65%
  • Hole STW-RC-106: 19.00 metres at 13.32% P2O5 including 5 metres at 18.91%

"These drill results indicate that our phosphate mineralization extends beyond the areas identified in our initial resource estimate. They also confirm that we have found additional high-grade phosphate mineralization suitable for future production of Direct Application Natural Fertilizer at Bomfim. Going forward, our exploration program will continue to focus on further delineating resources and the additional upside potential of these and other targets," said Prof. Paulo Amorim, DuSolo´s Vice President of Exploration.

"As the Company makes progress towards increasing its resources, it also looks to increase its sales. The company has already announced the receipt of orders to supply up to 51,100 tonnes of Direct Application Natural Fertilizer for approximately C$4.5 million. The company expects additional orders to ramp up once the rainfall in the region comes to a halt and farmers begin planting their crops," said Eran Friedlander, President and CEO of DuSolo.

During this round of drilling, a total of 90 holes totaling 1,902 meters were completed at both the Santiago and Tataco targets, located within the Bomfim Project. At the Santiago target, the results from drilling confirm the existence of phosphate mineralization in areas considered to date as "exploration potential" based on mapping and surface sampling. At the Tataco target, the results from drilling confirm the presence of higher grade mineralization within a thicker lower grade siltstone package. The drill results from both targets will be used to expand and further define the inferred resource previously reported in the Bomfim National Instrument 43-101 Initial Resource Estimate ("NI 43-101") published January 5th, 2014, and amended on February 6, 2015. The updated NI 43-101 resource estimate, will be released later this year.

Significant intersections with more than 10% P2O5 (suitable for production of Direct Application Natural Fertilizer) are shown in the table below.

Table 1: Santiago and Tataco Drill Results with intersections containing mineralization greater than 10% P2O5

Hole ID From (m) To (m) Total P2O5%
STW-RC-60 0.00 11.00 11.00 10.43
including 0.00 3.00 3.00 24.28
STW-RC-61 0.00 4.00 4.00 18.06
STW-RC-63 0.00 11.00 11.00 11.81
including 0.00 4.00 4.00 17.23
STW-RC-81 0.00 3.00 3.00 22.82
STW-RC-83 0.00 4.00 4.00 23.56
STW-RC-86 0.00 13.00 13.00 13.18
including 0.00 8.00 8.00 17.69
including 0.00 4.00 4.00 21.42
STW-RC-87 0.00 3.00 3.00 17.23
STW-RC-91 0.00 27.00 27.00 12.31
including 0.00 16.00 16.00 17.67
including 0.00 6.00 6.00 22.85
STW-RC-92 0.00 9.00 9.00 13.26
STW-RC-93 0.00 4.00 4.00 12.97
STW-RC-98 6.00 10.00 4.00 11.74
STW-RC-100 0.00 21.50 21.50 11.31
including 1.00 10.00 9.00 14.11
including 2.00 6.00 4.00 18.65
STW-RC-101 2.00 9.00 7.00 11.01
STW-RC-105 5.00 9.00 4.00 21.19
STW-RC-106 8.00 27.00 19.00 13.22
including 8.00 23.00 15.00 15.83
including 11.00 16.00 5.00 18.91
STW-RC-107 0.00 10.00 10.00 16.47
including 0.00 3.00 3.00 19.26
STW-RC-108 5.00 10.00 5.00 13.50
STW-RC-109 10.00 19.00 9.00 11.60
TT-RC-14 0.00 4.00 4.00 10.41
TT-RC-16 0.00 17.00 17.00 9.99
including 0.00 6.00 6.00 17.28

DETAILED DRILL HOLE INFORMATION

The Campaign started on November 18, 2014 and was concluded March 27, 2015 with a total of 90 reverse circulation ("RC") holes drilled at Santiago and Tataco targets.

The holes at Santiago are defined by the following sequence:

i) The target area (Santiago = ST),

ii) The exploration domain (W or P),

iii) The drilling method (reverse circulation = RC),

iiii) The drill hole number (*)

The holes at Tataco Target are defined by the following sequence:

i) The target area (Tataco = TT),

ii) The drilling method (reverse circulation = RC),

iii) The drill hole number (01-32).

* Holes STW-RC-01 to STW-RC-18 were completed in 2013 and the results were used to elaborate both the exploration model for Santiago and to calculate the Initial Resource Estimate of the Bomfim Project (previously announced January 22nd, 2014). Holes STW-RC-19 to STW-RC-59 were completed in 2014 and drilled at a 25 by 25 meter grid spacing as part of the pre mining drilling campaign. Holes STW-RC-60 to STW-RC-63, STW-RC-78 to STW-RC-80 and STW-RC-84 to STW-RC-115 were completed in 2015 as part of the 50 by 50 meter infill grid spacing over the area with inferred resources of the STW Domain. Holes STW-RC-64 to STW-RC-77 and STW-RC-81 to STW-RC-83 were completed in 2015 as part of the scout drilling program of Santiago´s "exploration potential".

To view accompanying map, visit the following link: https://media3.marketwire.com/docs/DuSolo_Map1.jpg

QUALITY CONTROL

The Company implements industry recognized QA/QC methods at the project by inserting high and low grade standard samples, blanks and duplicates. Chips from RC drilling are collected in bags for each one-meter interval. Chips are logged at the drill site and the samples are taken to a core shack located at DuSolo's field office. At the core shack the samples are then crushed and screened to less than 2mm prior to homogenization and quartering. An aliquot of one quarter from each sample is then sent for analysis.

A Qualified Person (identified below) has reviewed the QA/QC results and inspected all the procedures assuring the quality of the information being reported in this news release. Intertek Laboratories ("Intertek") of Sao Paulo Brazil, was used for analytical work reported in this news release. Intertek is part of an international group of certified (ISO 9001:2008) laboratories recognized in the industry for geochemical and agricultural testing. Determination of P2O5 was done by Intertek's method XR55L which prepared the sample with a lithium tetraborate fusion followed by XRF analysis. Intertek is independent of the Company.

Mauricio Prado, Bomfim's Project Manager, is a Qualified Person under National Instrument 43-101 and has reviewed and approved the technical disclosures of this press release on behalf of the company.

ABOUT THE COMPANY

DuSolo Fertilizers Inc. is focused on developing a fully integrated process to produce phosphate based fertilizers within the Cerrado region of Brazil as part of a nationwide effort, incentivized by the government, to increase supply of domestically sourced fertilizers and achieve agricultural self sufficiency.

The Company's shares are publicly traded on the TSX Venture Exchange under the symbol DSF, on the OTC Pink Sheets under the symbol ELGSF and on Frankfurt Stock Exchange under the symbol E6R.

On behalf of the Board of Directors

DuSolo Fertilizers Inc.

Eran Friedlander, President and CEO


<< Previous
Bullboard Posts
Next >>