Sherritt..cobalt Production volumes (tonnes -- 40% basis) | | | | | | |
Finished nickel | 7,450 | 5,775 | 29% | 1,550 | 1,244 | 1,231 |
Finished cobalt | 497 | 453 | 10% | 103 | 50 | 86 |
For the month of May, finished nickel production was 1,550 tonnes (3,874 tonnes, 100% basis), or approximately 76% of nameplate capacity, and finished cobalt production was 103 tonnes (257 tonnes, 100% basis). Ore throughput in the pressure acid leach (PAL) circuit was 354,109 tonnes (100% basis), or approximately 71% of nameplate capacity.