THE TIME IS NEARMarch 11 - Test batches of material from the Radcliff Mine that were stockpiled from previous underground mining operations are currently being processed at the Bishop Mill to optimize recoveries. It is anticipated that the Bishop Mill will be fully operational in the next sixty (60) days.
April 15 - A total of 20 systematic channel samples and 10 muck samples have been collected and will be submitted to ALS Global's assay facility in Reno Nevada with results expected to be available in approximately three weeks.
June 10 - Bulk samples taken from the Radcliff Project have been sent to the smelter
Let hope Bal and Sholtz have been selling to buy in and help finance. Seems like the smart thing to do.
GOOD LUCK ALL!
-B