Infield drill additional benefit Note that this amounts to a few $ in upgrades. Inferred resources now at 4.9 M oz gold and 3.9 M oz of silver.
Check inferred on page # 12. These totals will be even more humongous as the grassroots drilling is factored in. IMO
Plans and Objectives
40,000 meter infill underground drill program
Primary purpose is grade control, with drilling at 10-meter centers
Targeting stope areas in years 1-3 of mine plan (1320-meter level to 1200-meter level)
Additional benefit is infill drilling of inferred and non-stope indicated resources in the same area
3 drill stations / 32 drill fans 3 drills at peak drilling