Sudbury Mining Show ReportUPDATE On Friday Aug 21st Crone Geophysics along with Don Hawke the Geologist helicoptered in to perform the down hole probing of Pecors Drill Hole #2, this should take approximately 3 to 5 days. To what I understand Crone will get the results from Lamontagne Geophysics on drill Hile #1 and combine the results with drill hole #2 and give a report to IMT in about 3 weeks time, give or take . While there at the show a brochure or hand out was provided that showed the location of Drill hole #1 and #2. Talking with Don Hawke it seems that the first hole went through the Anomaly being the very tip of the Anomaly. The Second hole went to a depth of 1317 metres and just stopped shy of or near the outer crust of the anomaly, the drill started to struggle and they stopped there in fear of loosing the drill rod and core. I had a look at the core from drill hole #1 and it is what was reported in the news release a 1 to 3 percent mineralization. There was no core from drill hole #2 but in the report it states 1 to 15 percent mineralization, this I feel encouraged as they did not really enter the Anomaly, the hand out shows that a very large Anomaly below drill hole #2 at depth that extends to 3000 metres.