OTCPK:MAUXF - Post by User
Post by
CatalystTraderon Oct 24, 2015 8:23pm
183 Views
Post# 24224250
Drilling results
Drilling results
The UMU-14H well was successfully landed in the VIII sand and the horizontal section drilled to a total horizontal length of 1,000 feet. The well reached total depth of 9,280 feet (measured depth) on Aug. 10, 2015. Completion operations have been concluded and the drilling rig has been demobilized from the location. The initial cleanup and flow testing have yielded an initial flow of clean oil with no water cut. Detailed testing information will be released upon the conclusion of the testing program.
9