News for Integra Gold Corp. (V.ICG)Integra Gold Intersects 482.26 g/t Gold Over 1.00 Meter, 58.89 g/t Over 1.8 Meters, and 47.26 g/t Over 2.0 Meters in Parallel Zone Infill Drilling VANCOUVER, BC--(Marketwired - November 03, 2015) - Integra Gold Corp. (TSX VENTURE: ICG) (OTCQX: ICGQF) Press Release Highlights: Results from 9 drill holes disclosed today, 12 drill holes pending The objective of the Parallel Zone ("Parallel") drill program was to: Complete a 20 to 25 meter ("m") drill spacing pattern in selected sections of the Parallel Zone Collect additional metallurgical samples for further testing and processing optimization parameters Confirm continuity of the high grade 6b Zone 6 drill rigs currently in operation on site with an estimated 7,500 m to 9,000 m to be drilled per month for the balance of the year Integra Gold Corp. (TSX VENTURE: ICG) (OTCQX: ICGQF)("Integra" or the "Company") is pleased to announce additional results from its 2015 Parallel infill drilling program. In addition to the Triangle Zone, Parallel is one of the primary gold deposits at Integra's Lamaque South Gold Project ("Lamaque") located in Val-d'Or, Qubec. Parallel is located 2 kilometres ("km") northwest of the Triangle Zone and less than 800 m from the Company's milling facility. The objective of exploration work conducted at Parallel is to define a gold deposit with the ability to provide supplemental, high-grade mill feed in a future production scenario. Gold mineralization at Parallel would be accessed by way of a 700 m extension of existing underground workings which were acquired as part of the Company's 2014 purchase of the Sigma Mill and associated mineral titles, including the past producing Sigma and Lamaque Mines. All environmental, exploration, and mining permits are in place at Parallel, a number of which were acquired through the mill acquisition and subsequently transferred to Integra. "The results announced today continue to support our high level of confidence in both the continuity and grade of the gold mineralization at the Parallel deposit. While the Triangle Zone has emerged as the primary focus at Lamaque South, the Parallel Zone remains a great potential option for a supplementary source of high-grade mineralized material to be accessed and processed during the production phase at Lamaque," commented Company President and CEO Stephen de Jong. "Once final results become available they will be integrated into the Parallel Zone geological model which will be followed by an updated resource estimate."