RE:results Assays one week apart !
Jan 13, 2016
Integra Gold Announces New Gold Discoveries with C-Type Structures Identified below 1,000 m at Triangle, C4 Zone Continues to Grow with Step-Out Drilling, 2016 Program Underway with 7 Drills in
A total of 91,859 m in 206 holes was completed at Lamaque South in 2015, of which 59,753 m were conducted at Triangle.
The results announced today are from 23 drill holes, including 5 abandoned holes and 5 wedges, for a total of 13,150 m. As of January 4, 2016, results are still pending from an additional 27 holes representing 19,000 m. Results from ongoing infill and extensional drilling at Triangle will be disclosed during the winter as they become available.
Jan 19, 2016
Integra Gold Reports Multiple High-Grade Gold Intersects including 209.28 g/t gold over 1.5 meters in C1 Structure, and 51.78 g/t gold over 4.3 m in C5 Structure at Triangle Deposit
A total of 93,592 m in 203 holes was completed at Lamaque South in 2015 of which 59,753 m in 104 holes was conducted at Triangle.
The results announced today are from an additional 13 drill holes totalling 5,955 m. As of January 18, 2016, drill results are still pending from an additional 25 holes representing 14,650 m.
As some of these assays represent only partial sections of complete drill holes with further assays pending,
.