Nxe high grade holesRemember NXE holes are drilled vertical through the deposit that dips straight down. Before you get too carried away, imagine holes that go through PLS zones horizontally over the hundreds of meters of high grade sections. This is a better comparison. Then do a cost calculation on getting the stuff out of the ground one less than 100 meters down , the other between 400 and 800 meters down. Arrow at anywhere near the current U308 price cannot be mined at a profit.