RE:200M inferredSudzie,
Look at the ver conservative and small block size in the wire frame model. The current infill drill program will probably add another 100 million pounds, and over time, with continued drilling from surface and eventually underground, Arrow will double in size.
sudzie191 wrote: Well in my ebates with teevee and his 400 million, Pampies 600 million, I was closer at my 150 million.
If I include all of the inferred from FCU plus a sensible addition form FCU summer drilling, then together with the NXE which is 100% inferred tHere is now approximately $15 billion dollars worth of uranium between FCU and NXE.
This assumes a 3% yearly escalation of the price of uranium starting at $65 number used in the RPA report
I have been keeping a personal spreadsheet of this since about last summer.
I am not surprised to see Cameco picking up land in the region as per the newsy 2 weeks ago.
THe fun has just begun, lol