GREY:EORBF - Post by User
Post by
Wildvilleon Mar 15, 2016 12:09pm
282 Views
Post# 24660073
how long
how longSo if i read it right they are 1 third of the way with the piping. So is it really that long of a delay? My average is around 40c. . I don't like seeing the sp tank like this. Gk must have seen this coming. I am in noway a plumber or a piping master. But i would think that it can't be that hard. (Just my uneducated option ) so another 9.9m is needed. I wonder when orbites luck is going to turn around. Its such a let down when we can meet our deadline. I remember months ago it seems that gk saying that all major equipment is in place. So that makes me think piping is easy.