Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Nexgen Energy Ltd T.NXE

Alternate Symbol(s):  NXE

NexGen Energy Ltd. is a Canadian company focused on delivering clean energy fuel for the future. It is engaged in the acquisition, exploration and evaluation and development of uranium properties in Canada. It is focused on optimally developing the Rook I Project. It has a portfolio of highly prospective projects, including its 100% owned Rook I property that is host to the high-grade Arrow Deposit, South Arrow, Harpoon, Bow, and the Cannon area. The Rook I Project is a development-stage uranium project in Canada. The new underground mine and mill development is located in the uranium-rich district of the southwestern area of the Athabasca Basin, located in Saskatchewan. Arrow is a 100% land-based, basement-hosted, and high-grade uranium discovery. The Rook I Project, host of the Arrow Deposit, which is a development-stage uranium project in Canada and is 100% owned by NexGen Energy Ltd. The Rook I property hosts the Harpoon Discovery located 4.7 km northeast of the Arrow Deposit.


TSX:NXE - Post by User

Bullboard Posts
Comment by PamplonaTraderon Apr 04, 2016 9:45am
731 Views
Post# 24727092

RE:GROWING MONSTER: INFILLING THE HIGH GRADE DOMAIN

RE:GROWING MONSTER: INFILLING THE HIGH GRADE DOMAIN

RE-POSTING FOR PEOPLE NEW TO THE STORY:

 

     As the maiden estimate suggests, Arrow is twice the size of its closest competitor and at nearly double the overall grades.  Even with an absurd 10% U3O8 cut-off, Arrow would be amongst the largest deposits in the world.

     Here, it was obvious to many of us that Arrow was going to obliterate expectations en route to a monster initial resource estimate.  We knew Arrow would go on to claim the title of "Largest Undeveloped Uranium Deposit", and by a very wide margin.

     Despite all the superlatives early in the discovery of Arrow, it seems some, are once again hard at work trying to discredit NexGen's Arrow.  They were completely off the rails before the Maiden Resource Estimate, insisting that it was impossible for NexGen to put out a resource in excess of 200 Mlbs in just 82 holes.  Anyone who listened to the naysayers before the maiden estimate were forced to watch from the sidelines as NexGen surged to lifetime highs - capturing the hearts, minds, and pocket books of resources speculators everywhere.  

     For those of you who gave in to the haters and missed the first run... IT IS NOT TOO LATE!  The maiden estimate was just the tip of the iceberg and there is plenty of upside to be had.  

     I will demonstrate how RPA used conservative assumptions in the maiden estimate, thereby heavily constraining the resource.  I will also show how NexGen can rapidly upgrade the inferred A2 High Grade resource to indicated with aggressive infill drilling.  The aggressive infill drilling will not only convert inferred resource to indicated, I will also make clear that the A2 High Grade resource will continue to grow!   


 

THE MAIDEN RESOURCE: CONSERVATIVE ASSUMPTIONS

 Per the resource estimate, RPA capped grades at 55% and interpolated grades with an inverse distance cubed (ID3) function.

     The function can be expressed as:

[(25-d)/25]^3

 Wherein is the distance from the drill center.  25m is the maximum distance from the drill center (50m diameter area of influence). 

     This means an intercept of 70% U3O8 would be capped at 55% and grades just 10m away would be normalized down to ~12%

 

EXAMPLE 1:  UNINTERPOLATED (100m strike):

     For illustrative purposes, let's assume 20% U3O8 is continuous over an 100m strike, 5m depth and 5m width:
 

100m strike * 5m depth * 5m width * 3.92 tonnes/m^3 * 2204.62 lbs/tonne * 20% U3O8 = 4.321 Mlbs


TOTAL OVER 100m STRIKE:  4.321 Mlbs

 

EXAMPLE 2:  INTERPOLATED  (100m strike, 2 holes with 50m centers):

     For the Maiden NI 43-101 resource, NexGen methodically drilled holes with 50m centers to produce an inferred estimate:


First 5 meters (5m radius, 10m diameter)

5m strike * 5m depth * 5m width * 3.92 tonnes/m^3 * 2204.62 lbs/tonne * 20% U3O8 * 2 for both sides = 0.432 Mlbs

Next 5 meters (10m radius, 20m diameter)

5m strike * 5m depth * 5m width * 3.18 tonnes/m^3 * 2204.62 lbs/tonne * 10.24% U3O8 * 2 for both sides = 0.179 Mlbs

Next 5 meters (15m radius, 30m diameter)

5m strike * 5m depth * 5m width * 2.73 tonnes/m^3 * 2204.62 lbs/tonne * 4.32% U3O8 * 2 for both sides = 0.065 Mlbs

Next 5 meters (20m radius, 40m diameter)

5m strike * 5m depth * 5m width * 2.50 tonnes/m^3 * 2204.62 lbs/tonne * 1.28% U3O8 * 2 for both sides = 0.018 Mlbs

Last 5 meters (25m radius, 50m diameter)

5m strike * 5m depth * 5m width * 2.41 tonnes/m^3 * 2204.62 lbs/tonne * 0.16% U3O8 * 2 for both sides = 0.002 Mlbs


Per hole with max 50m Area of Infuence: 696 klbs

TOTAL FOR TWO HOLES:  1.392 Mlbs


     The above example clearly demonstrates that the inferred resource is not assuming mineralization is continuous throughout the orebody and as a consequence, the resource is being heavily discounted.  

 

INFILL DRILLING:  CONVERTING INFERRED TO INDICATED

     Eyeballing the cross-section below, the H2 High Grade domain appears to roughly measure 200m strike x 200m depth.
 

User image


     It would require 100 holes using 20m centers to infill a 40,000m^2.  I can then divide the area in half to account for the triangular shape.  As a result, only 50 holes are needed to upgrade the triangle-shaped A2 High Grade domain to a fully indicated resource.  

     Each directional hole branching from the pilot hole cores 500m-600m so 50 holes x 600m = 30,000m of drilling.  If 30,000m are drilled each season and 3 of 6 rigs drilling at Rook I are infilling Arrow's A2 High Grade domain, then it would only require 2 seasons (winter and summer 2016) to complete the conversion of the A2 High Grade domain to a fully indicated resource. 

     In case you were wondering, the above assumptions w/r/t the dimensions of the A2 High Grade domain reconcile to the resource estimate.

200m strike * 200m depth * 6m width * 3.4 tonnes/m^3 * 1/2 to account for triangle shape = 410,000 tonnes.

     6m width of the A2 High Grade domain per wireframes from the resource estimate.

 

INFILL DRILLING:  INCREASING THE A2 HIGH GRADE RESOURCE

     20m infill drilling at Arrow will not only convert the inferred resources to indicated, it will also INCREASE the size of the resource in the next estimate. 


EXAMPLE 3:  INTERPOLATED  (100m strike, 5 holes with 20m centers):

     So what would happen to the A2 High Grade resource if it were infilled with 20m spacing?   
 

First 5 meters (5m radius, 10m diameter)

5m strike * 5m depth * 5m width * 3.92 tonnes/m^3 * 2204.62 lbs/tonne * 20% U3O8 * 2 for both sides = 0.432M lbs

Next 5 meters (10m radius, 20m diameter)

5m strike * 5m depth * 5m width * 3.18 tonnes/m^3 * 2204.62 lbs/tonne * 10.24% U3O8 * 2 for both sides = 0.179M lbs


Per hole with max 20m Area of Influence:  611 klbs

TOTAL FOR FIVE HOLES:  3.055 Mlbs

 

     Note how in EXAMPLE 2, the same block yields just 1.392 Mlbs as a consequence of the ID3 function.  As with the examples above, I wouldn't be shocked at all if the A2 High Grade resource more than doubled in size with just infill drilling!

 

INFILL PROGRESS:  INCREDIBLE CONTINUITY

     How has infilling progressed since the maiden estimate?  

     Hole 49c2, the most easterly hole, was drilled 41m from hole 44b.  Hole 58c1, the most westerly hole, was drilled 51m from hole 44b.  Below a cross section view of the pierce points illustrating the methodical infill drilling using ~20m spacing.

User image


     Finally, the assay results I present below highlight the incredible continuity of Arrow's A2 High Grade domain (120.5Mlbs inferred @ 13.26% U3O8):
 

* Hole 49c2 returned 18m of 20.55%;
* Hole 64c1 returned 12.5m of 20.42%;
* Hole 64c2 returned 26.5m of 20.13%;
* Hole 44b returned 20m of 20.68%;

* Hole 63c2 returned discrete intervals of 31m @ 20.09% and 27m of 19.98%;
* Hole 62 returned discrete intervals of 23m @ 20.37% and 13.50m of 20.59%;
* Hole 63c1 returned 8m @ 20.15%and 
* Hole 58c1 retunred 11m @ 30.61%


      Holes listed east to west.



UPDATE: From Leigh's CEO.ca Subscriber Investment Summit Presentation.  Pay very close attention to what Leigh says starting the 10:50 mark.

 


Bullboard Posts