RE:RE:Looks ready to pop... "As of April 20, 2016, drilling continues on the first hole and has reached a depth of 575 metres. Drilling of the second hole is also continuing and has reached a depth of 800 metres. The two holes are spaced approximately 500 metres apart, and both are near vertical (dip of minus 80 degrees). Casapalca also advises that sample preparation is well under way on the first 400 metres of each hole, but no samples have been submitted to a lab yet."
Read more at https://www.stockhouse.com/companies/bullboard/bullboard/v.cn/condor-resources-inc#wezxr3JY2xfquspb.99